Project scheduling and analysis: CPM, PERT, Monte Carlo, EVM, S-curves, resource leveling, sensitivity. Working calendars with holidays (pt-BR built-in). SVG Gantt and analysis rendering.
Maintainers
Readme
@plan
Project management library for auditable notebooks. CPM scheduling, PERT estimation, Monte Carlo simulation, earned value management, and analysis functions.
usage
const plan = await load("@plan");modules
| File | Description |
|------|-------------|
| calendar.js | Working day calculations, holidays, blocked periods |
| pert.js | PERT three-point estimation |
| graph.js | Topological sort, cycle detection, predecessors/successors |
| schedule.js | CPM forward/backward pass, critical path, float |
| resource.js | Resource conflict detection, leveling |
| scurve.js | S-curve generation (planned/actual/forecast) |
| evm.js | Earned value management (BAC, EV, PV, AC, SPI, CPI) |
| analysis.js | 16 analysis functions (see below) |
| workflow.js | Workflow templates, stage gates, throughput |
| montecarlo.js | Monte Carlo simulation with sensitivity tracking |
| render.js | SVG renderers (Gantt, S-curve, histogram, tornado, etc.) |
| xlsx.js | Excel export |
| holidays-br.js | Brazilian holidays (federal, state, municipal) |
analysis functions
- Schedule: whatIf, delayImpact, nearCritical, slackBudget, scopeDrift, bufferStatus
- Resource: busFactor, switchingOverhead, meetingCost, constraint
- Math models: brooksLaw, littlesLaw, multiProjectFragmentation
- Progress: burndown, health, compress
renderers
gantt, scurvePlot, resourceHistogram, stageGateView, workflowDiagram, monteCarloPlot, deadlineRiskPlot, tornadoPlot, burndownPlot
brazilian holidays
// Federal + state + municipal
const cal = plan.brazilCalendar(2026, 2027, { municipality: "belo horizonte-MG" });
cal.blocked = [{ start: "2026-04-06", end: "2026-04-17", label: "Vacation" }];
// Options: carnival, corpusChristi, optional (pontos facultativos)
plan.brazilMunicipalities(); // list available municipalitiesCovers all 27 state capitals + Parauapebas, Canaa dos Carajas, Maraba (PA).
build
node ext/plan/build.jsConcatenates src/*.js into index.js, stripping ES module syntax.
roadmap
rework duration scaling
Current rework transitions in Monte Carlo re-run tasks at full PERT duration. In practice, rework is faster than the original pass (data exists, parameters are tuned, downstream artifacts just need updating). Enhancement:
reworkTransitions: [{
from: "validation", to: "estimation",
probability: 0.3,
durationScale: { estimation: 0.4, validation: 0.5 }
}]durationScale would multiply the sampled PERT duration on rework iterations, per task. Tasks not listed default to 1.0 (or a configurable defaultReworkScale). This models the reality that re-estimation after a validation failure takes ~40% of original time, not 100%.
not yet implemented (need historical data)
darkTime, gateMetrics, learningCurve, reworkAmplification, referenceClass, overheadRatio, outsourcingAnalysis, fragmentation, utilizationCurve — all require completedInstances / stageHistory data.