GanttChart (Nunjucks helper)
A reusable, headless Nunjucks 3 + vanilla-JS Gantt chart: task bars as
column-spanning grid cells (never pixel-positioned floating divs),
row hierarchy with collapse/expand, milestones, percent-complete, a
today marker, finish-to-start dependency data exposed as text, and a
keyboard-accessible edit region composed from
@lilydesignsystem/nunjucks-date-time-picker — never drag-only.
The single source of truth is spec/index.md. This file is the user guide. For topic deep-dives see docs/ and for working code see examples/.
Table of contents
- Why this exists
- How the pieces fit — and the one architectural gotcha
- Install
- Quick start
- Macro parameters
- Client.js API
- Row hierarchy
- Editing a task's dates
- Dependencies
- Accessibility
- Styling
- SSR and the first paint
- Testing
Why this exists
A Gantt chart is a grid whose every cell depends on real calendar arithmetic (which day does column 14 fall on when the range starts on a Tuesday in a leap year?) and whose primary interaction — rescheduling a task — is usually shipped as drag-only, locking out anyone who can't drag (WCAG 2.5.7). This helper renders task bars as ordinary column-spanning table cells rather than floating, pixel-positioned divs, and makes a keyboard-accessible edit region (two date pickers, Save/Cancel) the PRIMARY way to reschedule a task, with drag as a supplementary convenience.
The helper is a port of the Svelte canonical
@lilydesignsystem/svelte-gantt-chart. See
spec/index.md §4
for every documented prop deviation a Nunjucks macro's inability to
evaluate a callback requires.
How the pieces fit — and the one architectural gotcha
Like every helper in this catalog, this is a macro + client.js
pair — but unlike the others, the split here is unusually deep:
gantt-chart.client.js builds the entire time-axis header and every
grid-body cell, not just the interactive behaviour. Generating
range/timeUnit into a list of day/week/month columns needs real
civil-date arithmetic (days-in-month, leap years) that a Nunjucks
template cannot do at all — see
spec/index.md §3
for the full reasoning, which mirrors date-time-picker.njk's own
documented calendar-grid split.
Nunjucks render time │ Browser runtime
│
{{ ganttChart({…}) }} │ import { autoInit } from
│ │ "./gantt-chart.client.js";
▼ │ autoInit({ onTaskChange, labels });
<div data-lily-gantt-chart-root │ │
data-lily-gantt-chart-range-start │ ▼
data-lily-gantt-chart-range-end │ generateColumns(range, timeUnit)
data-lily-gantt-chart-time-unit> │ │
<table role="grid"> │ ▼
<thead>… leading <th> only …</thead> │ appends one <th> per column
<tbody> │ │
<tr data-lily-gantt-chart-start │ ▼
data-lily-gantt-chart-end> │ appends one <td> per row per
<th>task label, collapse…</th> │ column: data-in-range,
</tr> │ data-milestone, data-today,
<tr class="gantt-chart-edit-row" │ the task bar
hidden>… 2 date pickers …</tr> │
</tbody> │
</table> │
<p aria-live="polite"></p> │
</div> │What this means practically: a no-JS page shows every task's row
and label, but no dates, no bars, and no way to edit or reschedule
anything — the chart is entirely inert until gantt-chart.client.js
runs. Row hierarchy, though, IS fully server-rendered (a parentId
tree walk needs no calendar arithmetic), and so is each row's own
derived date range for parent tasks — see
Row hierarchy below.
Typed fields, editing and export
- Typed fields and editing (0.5.0):
fields+task.valuesadd typed columns;editableFieldsedits them in place (click, F2, Tab). See spec §11. - Export and virtualization (0.5.0):
labels.exportCsv/exportTsv/exportExcelpluslabels.exportHeadersadd CSV, TSV and Excel buttons;virtualizewindows long task lists.
Install
| File | Purpose |
| --- | --- |
| gantt-chart.njk | The Nunjucks macro. |
| gantt-chart.client.js | The ES-module runtime — builds the time axis and grid. |
| spec/index.md / index.md | Documentation. |
Runtime dependencies: nunjucks ≥ 3 server-side; standard DOM APIs
client-side. @lilydesignsystem/nunjucks-headless (gantt-table macro
family) and @lilydesignsystem/nunjucks-date-time-picker (composed
twice per edit session) are real npm dependencies of this package.
Quick start
{% from "@lilydesignsystem/nunjucks-gantt-chart/template" import ganttChart %}
{{ ganttChart({
label: "Q4 plan",
range: { start: "2026-10-01", end: "2026-10-31" },
tasks: [
{ id: "design", label: "Design", start: "2026-10-01", end: "2026-10-03" },
{ id: "build", label: "Build", start: "2026-10-04", end: "2026-10-08", dependsOn: ["design"], percentComplete: 40 },
{ id: "launch", label: "Launch", start: "2026-10-09", end: "2026-10-09" }
],
labels: {
saveLabel: "Save",
cancelLabel: "Cancel",
startLabel: "Start date",
endLabel: "End date",
dependencySummary: "Blocked by: {predecessors}",
collapseLabel: "Collapse {task}",
expandLabel: "Expand {task}",
dateTimePickerLabels: {
previousYear: "Previous year", previousMonth: "Previous month",
previousWeek: "Previous week", previousDay: "Previous day",
nextDay: "Next day", nextWeek: "Next week",
nextMonth: "Next month", nextYear: "Next year",
confirm: "Confirm", cancel: "Cancel"
}
}
}) }}<script type="module">
import { autoInit } from "@lilydesignsystem/nunjucks-gantt-chart";
autoInit({
onTaskChange(taskId, start, end) {
// persist the reschedule — an API call, a form submit, whatever your app does
},
labels: {
columnLabel: (start) => start, // or format however you like
dateAnnouncement: (taskLabel, start, end) => `${taskLabel} moved to ${start} – ${end}`,
},
});
</script>Macro parameters
Full table, and every Svelte-prop-to-Nunjucks deviation, in
spec/index.md §4.
Required: label, range, tasks. Optional: caption, timeUnit
("day" default), today, labels, name, id, classes,
attributes.
Two labels are notably NOT macro params, unlike every other helper's
labels.* fields — columnLabel and dateAnnouncement stay real
functions passed only to initGanttChart/autoInit, because neither
column headers nor a completed edit exist until after hydration. See
the deviation table linked above.
Client.js API
import {
initGanttChart,
autoInit,
compareISO,
endOfMonth,
generateColumns,
rangesOverlap,
} from "@lilydesignsystem/nunjucks-gantt-chart";autoInit(opts?)— find every[data-lily-gantt-chart-root]on the page and wire it.initGanttChart(root, opts?)— wire a single root<div>; builds the time-axis header and every grid cell, and returns{ destroy }.compareISO,endOfMonth,generateColumns,rangesOverlap— the pure date-math/column-generation helpers, exported for direct use and testing (mirrors the Svelte canonical's own exported utilities).
opts:
onTaskChange(taskId, start, end)— called after every successful edit, by either path.labels.columnLabel(start, end, timeUnit)— formats a column header; defaults to the column's ownstartwhen absent.labels.dateAnnouncement(taskLabel, start, end)— builds thearia-liveannouncement text; absent means no announcement fires.
Row hierarchy
task.parentId builds the row tree entirely SERVER-SIDE — depth,
whether a row has children, and (for a parent) its DERIVED start/
end (the min start / max end across all its descendants,
recursively) are all resolved by gantt-chart.njk and baked onto each
row as data attributes. A parent row is never itself directly
editable — no edit region is ever rendered for it.
Clicking (or activating) a parent's collapse button removes every
descendant row — and that descendant's own edit row, if any — from
the DOM outright, and restores them, in original order, on expand.
gantt-chart.client.js never re-walks the task tree to do this: a
row's descendants are always the contiguous run of next-siblings whose
own depth exceeds its own, a direct consequence of the server's
depth-first render order.
Editing a task's dates
Enter/Space on a focused non-parent row's grid cell opens that row's
own (always-rendered, hidden) inline edit region: two composed
DateTimePicker instances, mode="date", pre-seeded with the task's
current start/end. Save calls onTaskChange; Cancel discards.
Every open re-initialises both date pickers fresh and destroys them on
close — date-time-picker.client.js has no imperative "reset" call,
so this is how a cancelled or re-opened edit always starts from the
task's own real dates rather than a stale typed value from a previous
session.
Editing is entirely gated on labels.dateTimePickerLabels being
supplied: when it's absent, no edit row is rendered anywhere in the
chart, matching date-time-picker's own "labels are required"
contract.
Dependencies
task.dependsOn (an array of other tasks' ids) is resolved to those
tasks' own labels SERVER-SIDE and rendered as a visually-hidden
summary text in the row's own header cell, built from
labels.dependencySummary. Every body cell in that row carries
aria-describedby pointing at it. No dependency arrow is ever drawn —
see spec/index.md §9 and
spec/helpers/index.md's gantt-chart contract for why: two commercial
Gantt libraries' own accessibility documentation treat rendering an
accessible dependency line as unsolved industry-wide.
Accessibility
- WAI-ARIA APG Grid pattern (
role="grid", set explicitly by this macro). - Roving tabindex for the grid, scoped to the current visible row list (collapse/expand changes it).
- Editing via composed
DateTimePickeris the accessible path for rescheduling; drag is supplementary, never required. - One
aria-live="polite"region for every edit announcement.
Weekend shading and dependency arrows (0.6.0)
weekends(weekdays, 0 = Sunday … 6 = Saturday, never defaulted) marks day columnsdata-weekendon the header and every cell; the 57themes/tint them. Week and month columns are not marked.dependencyArrowsdraws anaria-hiddenSVG arrow (.gantt-chart-dependency-arrow,data-from,data-to,data-dependency-type) per dependency by its type (e2s,s2s,s2e,e2e), measured from the rendered cells; the text description (labels.dependencySummary) remains. See spec §17.
Keyboard
| Key | Where | Action |
| --- | --- | --- |
| Arrow keys | Grid cell | Move the roving-tabindex cursor; clamp at the current grid's edges. |
| Home / End | Grid cell | Jump to the first/last column of the current row. |
| Ctrl+Home / Ctrl+End | Grid cell | Jump to the grid's first/last cell. |
| Enter / Space | Grid cell (non-parent row) | Open that row's edit region. |
| — | Grid cell (parent row) | Does nothing — parent rows are never directly editable. |
Styling
Ships no CSS. Class hooks: .gantt-chart (root), .gantt-chart-bar,
.gantt-chart-collapse-button, .gantt-chart-dependency-summary,
.gantt-chart-edit-row, .gantt-chart-save-button,
.gantt-chart-cancel-button, .gantt-chart-status, plus every
.gantt-table* class from the composed headless macro family and
every .date-time-picker* class from the two composed date pickers.
SSR and the first paint
The macro is pure. It renders every row's structure (label, collapse
button, dependency summary, the two composed date pickers per
editable row) but NO date columns and NO grid cells — see
How the pieces fit
above for why. The chart shows no dates or bars at all until
gantt-chart.client.js runs. This is a real, deliberate, documented
trade-off — the same one date-time-picker.njk already accepts for
its own calendar grid — not an oversight.
Testing
vitest under a jsdom environment exercises every §9 acceptance
clause in spec/index.md §9,
plus dedicated regression tests for the edit-region reset-on-reopen
behaviour and the collapse/expand DOM-removal mechanics described in
spec/index.md §7.
Files in this directory
| File | Purpose |
| --- | --- |
| spec/index.md | Single source of truth — API, behaviour, tests. |
| AGENTS.md | Fast-index pointer. |
| gantt-chart.njk | The macro. |
| gantt-chart.client.js | The ES-module runtime. |
| gantt-chart.test.ts | vitest suite covering every spec §9 item. |
| index.md | This file. |
| docs/ | Deep-dive topic guides. |
| examples/ | Runnable Nunjucks templates. |
| CHANGELOG.md | Version history. |
License
MIT or Apache-2.0 or GPL-2.0 or GPL-3.0 or BSD-3-Clause. Contact [email protected] for other terms.
Search, copy, keyboard, validation and undo (0.7.0)
- Added search:
labels.searchrenders a field that keeps the tasks by label and field text; every typed word must appear (any order), ignoring case and diacritics; matches are marked with<mark class="mark gantt-chart-match">;labels.searchAnnouncementannounces the count; Escape clears. - Added PageUp / PageDown, type-ahead on task labels, and right-to-left arrow keys (
isRtl,logicalKey;gridMovefromshared/). - Added copy to the clipboard:
labels.copyrenders a button that puts the export (header row first, tab-separated) on the clipboard;labels.copyAnnouncement,labels.copyFailed, the client optiononCopy({ text, rowCount })(returnfalseto take over) and thecopyevent. - Added field
validate(the editor stays open witharia-invalid;labels.editRefusedannounces the reason) and undo / redo of field edits (Ctrl/Cmd+Z, Ctrl/Cmd+Shift+Z / Ctrl+Y) reported throughonFieldEditand thefieldeditevent;labels.fieldUndoAnnouncement/fieldRedoAnnouncement. - The task label is now wrapped in
<span class="gantt-chart-task-label" data-lily-gantt-chart-task-label-text>(search marks inside it). - Not yet ported from the Svelte package: the headless
SearchInput/Markcomposition (the client builds the same markup by hand), filter, sort, unavailable days.
Lily™ and Lily Design System™ are trademarks.
Critical path (optional helper)
The chart renders critical and slack; it computes nothing. applyCriticalPath(tasks) (or criticalPath(tasks) for the raw result) fills them in: a forward and backward pass over leaf tasks, all four dependency kinds (e2s, s2s, e2e, s2e) with lags and leads in calendar days. A task's own start is a floor, so dependencies only push tasks later; summary rows, unscheduled tasks and unknown ids are ignored; a dependency cycle is reported in cycle and left out. Show it with labels.criticalLabel.
Lag is in calendar days by default. For schedules that count business days, pass { lagUnit: "working-days", weekends, unavailable } (the same weekends and unavailable you give the chart for shading): a lag of N then moves N working days, skipping weekends (default Saturday and Sunday) and the listed holidays, and the backward pass keeps a predecessor off non-working days so a weekend is never reported as slack. Task spans stay as dated; only the gaps between tasks change.
import { applyCriticalPath } from "@lilydesignsystem/nunjucks-gantt-chart";
const tasks = applyCriticalPath(rawTasks); // each leaf task gains critical / slack