@planningcenter/pca-bridge
v0.0.8
Published
```bash yarn install yarn build # production build via rollup + tsc declarations yarn develop # swc watch build yarn develop:yalc # publish to local yalc, push on src changes ```
Downloads
1,203
Keywords
Readme
@planningcenter/pca-bridge
Development
yarn install
yarn build # production build via rollup + tsc declarations
yarn develop # swc watch build
yarn develop:yalc # publish to local yalc, push on src changesLocal consumer setup
In a consuming project:
yalc add @planningcenter/pca-bridge && yarn installReleases
Releases are managed by pco-release-action. Add the pco-release-pending label to a PR; merging to main publishes the release.
