I’ve always been into building performant and accessible sites, but lately I’ve been taking it extremely seriously. So much so that I’ve been building a tool to help me optimize and monitor the sites that I build to make sure that I’m making an attempt to offer the best experience to those who visit them. If you’re into performant, accessible and SEO friendly sites, you might like it too! You can check it out at Optimize Toolset.

About

Hi, 👋, I’m Ryan Hefner  and I built this site for me, and you! The goal of this site was to provide an easy way for me to check the stats on my npm packages, both for prioritizing issues and updates, and to give me a little kick in the pants to keep up on stuff.

As I was building it, I realized that I was actually using the tool to build the tool, and figured I might as well put this out there and hopefully others will find it to be a fast and useful way to search and browse npm packages as I have.

If you’re interested in other things I’m working on, follow me on Twitter or check out the open source projects I’ve been publishing on GitHub.

I am also working on a Twitter bot for this site to tweet the most popular, newest, random packages from npm. Please follow that account now and it will start sending out packages soon–ish.

Open Software & Tools

This site wouldn’t be possible without the immense generosity and tireless efforts from the people who make contributions to the world and share their work via open source initiatives. Thank you 🙏

© 2026 – Pkg Stats / Ryan Hefner

@sano1023/rs-gantt

v0.5.0

Published

依存ゼロの対話型プロジェクトガントチャート(日本の祝日・営業日カレンダー内蔵)

Readme

配布版(ビルド済み) — 本パッケージはビルド済みファイルのみを含みます。 利用は無償(商用可)ですが、改変・再配布はできません(LICENSE.txt 参照)。 機能追加・改修のご依頼は有償で承ります → https://parelabo.com ([email protected])

インストール

npm install @sano1023/rs-gantt

npmjs.com の公開パッケージです。ログインやトークンは不要です。 更新・旧レジストリからの移行の詳細は 共通インストール手順 を参照してください。登録済みバージョンは npm で確認できます。以下のパッケージ名による import は Vite などのバンドラ向けです。

npm install https://github.com/sano1023/rs-package/raw/main/tarballs/rs-gantt-0.5.0.tgz

使い方

バニラ JS(ESM・バンドラあり)

import { createRSGantt } from '@sano1023/rs-gantt';
import '@sano1023/rs-gantt/rs-gantt.css';   // スタイル(バンドラ経由)

createRSGantt(document.querySelector('#app'), { /* オプション */ });

<script> タグ(CDN・ビルド環境不要)

<link rel="stylesheet" href="https://cdn.jsdelivr.net/npm/@sano1023/[email protected]/dist/rs-gantt.css">
<script src="https://cdn.jsdelivr.net/npm/@sano1023/[email protected]/dist/rs-gantt.min.js"></script>
<script>
  // 公開APIはグローバル RSGantt に載る
  RSGantt.createRSGantt(document.querySelector('#app'), { /* オプション */ });
</script>

Vue 3

import { RsGantt } from '@sano1023/rs-gantt/vue';
import '@sano1023/rs-gantt/rs-gantt.css';   // スタイル(バンドラ経由)
<template>
  <RsGantt />
</template>

React 18 / 19

import { RsGantt } from '@sano1023/rs-gantt/react';
import '@sano1023/rs-gantt/rs-gantt.css';   // スタイル(バンドラ経由)

export default function App() {
  return <RsGantt />;
}

vue / react は peerDependency です(バンドルには含みません)。アプリ側のものが使われます。


rs-gantt

依存ゼロの対話型プロジェクトガント。バーをドラッグすれば計画そのもの(start / duration / progress / 依存関係)が書き換わり、依存タスクが連鎖して動く、スケジューリングエンジンを持つ編集ツールです(現在 v0.5)。

  • 依存ゼロ・ライセンスキー不要: ランタイム依存なし。ビルド済みの ESモジュールをパッケージから import できる
  • 日本の祝日・営業日カレンダー内蔵: 土日 + 日本の祝日(春分/秋分の計算式・振替休日・国民の休日・五輪特例まで内蔵計算、2000〜2099年)+ 年末年始。非稼働日は網掛けされ、ドラッグは営業日にスナップ、duration は営業日数
  • スケジューラビュー(v0.5): view: 'scheduler' で 縦軸=リソース(部屋/設備/人)× 横軸=時間 の予約・シフト表ビュー。イベントをドラッグで別リソース/別時間へ移動・右端で終了時刻を変更でき、同一リソースで時間が重なるイベントは段組み(レーン)表示。営業時間ウィンドウ(dayStart/dayEnd)・非稼働日の網掛けに対応
  • 大規模データと入出力(v0.4): 仮想スクロール(1万タスクでも可視域だけをDOM描画・左右ペイン同期・行高固定32px、初期描画1000ms以内)・Excel/TSV貼り付けインポート(name/start/end/担当 + インデントで階層化)・CSVエクスポート(BOM付きUTF-8)・PNGエクスポート(タイムラインを canvas 描画)・印刷CSS(A4横・ページ分割)
  • リソースとトラッキング(v0.3): リソース(担当者)割当(バー右/グリッド列にアバター+名前)・リソースヒストグラム(下部パネルで日別の割当合計・過負荷を赤表示・稼働率ビュー)・ベースライン比較(計画スナップショットをバー下に薄いバーで表示・遅延日数列)・進捗ライン(today 基準のイナズマ線)
  • スケジューリングエンジン(v0.2): 依存タイプ4種(FS / SS / FF / SF)+ lag・自動スケジューリング(先行を動かすと後続が連鎖シフト・循環は検出して拒否)・クリティカルパス表示(スラック0のタスク/リンクを強調)・サマリー(親)の期間/進捗を子から自動集計
  • 対話型編集: バーのドラッグ移動・両端リサイズ・進捗ハンドル・端点○からの依存線作成・マイルストーン移動・行のドラッグ並べ替え / Tab・Shift+Tab でインデント・アウトデント。すべて undo/redo(Ctrl+Z / Ctrl+Y)可能
  • タスクツリーグリッド: WBS番号・折りたたみ・列カスタム・列幅ドラッグ・集計フッター行・左右ペインのスプリッタ
  • 6段階ズーム: 時 / 日 / 週 / 月 / 四半期 / 年(Ctrl+ホイールでも段階ズーム)
  • 3行で最初のガントが出る宣言的API + toJSON()/fromJSON() ラウンドトリップ保証
  • プラグインAPI: today線や非稼働日網掛けなどの組み込み機能も defineGanttColumn()(footer で集計行)/ defineGanttOverlay() で実装(dogfooding)
  • ライセンス: MIT

対応ブラウザ: 最新の Chrome / Edge / Safari / Firefox

rs-chart の gantt タイプとの棲み分け: rs-chart の gantt は「データを図として描く」レポート/ダッシュボード埋め込み用の静的チャートタイプです。rs-gantt は WBSツリー編集・ドラッグによる計画変更・依存伝播・undo/redo を持つ計画立案ツールでコードは共有しません。閲覧専用の埋め込みが欲しいだけなら rs-chart を使ってください。

デモ

# このリポジトリで
php -S localhost:8099   # または任意の静的サーバー
# → http://localhost:8099/rs-gantt/demo/ を開く

デモには「+タスク追加 / +子タスク」ボタンと、行/バーのダブルクリックで開く編集ダイアログ(名前・開始日・日数・進捗・マイルストーン・削除)を同梱しています。これはライブラリ内蔵UIではなく、taskDblClick フックと addTask/updateTask/removeTask API でアプリ側の編集UIを作る実装例です(デモのソース参照)。「休日にも予定を引く」チェックで暦日スケジュールも試せます。

ソフト開発プロジェクト21タスクの工程表に加え、ページ下部にスケジューラビュー(会議室・設備予約)(v0.5)を同梱:予約ブロックをドラッグで別の部屋/別の時間へ移動・右端で終了時刻を変更でき、同じ部屋で時間が重なる予約は段組みで並び、土日は網掛けされます。さらに1万タスク生成(仮想スクロール)・TSV貼り付けインポート・CSV/PNG書き出し・印刷(v0.4)や、リソース割当(担当者アバター)・下部リソースヒストグラム(過負荷を赤表示・稼働率ビュー)・ベースライン保存と比較(薄い計画バー+遅延日数列)・進捗ライン(イナズマ線)(v0.3)、ズーム切替(時/日/週/月/四半期/年・Ctrl+ホイール)・全ドラッグ操作・依存線作成と依存タイプ切替(FS/SS/FF/SF)・自動スケジュールのON/OFF・クリティカルパス表示・行のインデント(Tab)/ドラッグ並べ替え・集計フッター・undo/redo・JSONラウンドトリップ・イベントログを試せます。

import { createRSGantt } from '@sano1023/rs-gantt';
import '@sano1023/rs-gantt/rs-gantt.css';

クイックスタート

<div id="app" style="height: 480px"></div>
import { createRSGantt } from '@sano1023/rs-gantt';
createRSGantt('#app', { tasks: [{ id: 1, name: '要件定義', start: '2026-07-06', duration: 5 }] });

実務向けのフル指定:

const gantt = createRSGantt('#app', {
    tasks: [
        { id: 1, name: '設計フェーズ', open: true },                                  // 親 = サマリータスク
        { id: 2, parent: 1, name: '要件定義', start: '2026-07-06', duration: 5, progress: 60, assignees: ['sato'] },
        { id: 3, parent: 1, name: '基本設計', start: '2026-07-13', duration: 10, assignees: [{ resource: 'tanaka', units: 0.5 }] },
        { id: 4, name: 'リリース判定', start: '2026-07-31', milestone: true },
    ],
    links: [{ from: 2, to: 3, type: 'FS' }],           // type: 'FS'|'SS'|'FF'|'SF'(既定 FS)+ lag?
    resources: [                                       // v0.3 リソース(担当者)
        { id: 'sato', name: '佐藤', color: '#4e79a7', capacity: 1 },
        { id: 'tanaka', name: '田中', color: '#59a14f' },
    ],
    calendar: { holidays: 'jp' },                      // 土日 + 日本の祝日 + 年末年始(既定値なので省略可)
    zoom: 'week',                                      // 'hour'|'day'|'week'|'month'|'quarter'|'year'
    autoSchedule: true,                                // 依存の連鎖シフト(後続を先行制約の満たされる位置へ押し出す)
    criticalPath: false,                               // クリティカルパスの強調表示(gantt.setCriticalPath(true))
    resourceHistogram: true,                           // 下部リソースヒストグラム(日別の割当合計・過負荷を赤)
    progressLine: false,                               // 進捗ライン(イナズマ線)
    columns: ['wbs', 'name', 'assignees', 'start', 'duration', 'progress', 'delay'],
});

gantt.on('taskDrop', (e) => save(e.task));             // ドラッグ確定(move/resize/progress共通)
gantt.on('taskDblClick', (e) => openEditor(e.task));   // 編集UIはアプリ側が出す
gantt.updateTask(3, { progress: 30 });
gantt.updateLink({ from: 2, to: 3 }, { type: 'SS', lag: 2 }); // 依存タイプ / lag を変更
gantt.setCriticalPath(true);                           // クリティカルパス表示
gantt.assignResource(3, 'sato', 0.5);                  // v0.3 リソース割当(units=0.5=50%)
gantt.captureBaseline();                               // v0.3 現在の日程を計画として保存(遅延日数の基準)
gantt.setProgressLine(true);                           // v0.3 進捗ライン(イナズマ線)
gantt.indentTask(3); gantt.outdentTask(3);             // インデント / アウトデント
gantt.zoomTo('quarter'); gantt.scrollToTask(4);
gantt.undo(); gantt.redo();
const json = gantt.toJSON();  gantt.fromJSON(json);    // ラウンドトリップ保証(リソース/割当/ベースライン含む)
gantt.destroy();

API

createRSGantt(target, options): Gantt

| オプション | 既定値 | 説明 | |---|---|---| | tasks | [] | タスク配列(下記形式) | | links | [] | 依存リンク配列(FS/SS/FF/SF + lag) | | resources | [] | リソース(担当者/部屋/設備)配列 { id, name, color?, capacity? }(v0.3・スケジューラの縦軸にも使用) | | view | 'gantt' | 'gantt'(ツリー+タイムライン)/ 'scheduler'(縦軸=リソース×横軸=時間の予約表)(v0.5) | | events | [] | スケジューラのイベント配列(下記形式)(v0.5) | | scheduler | {} | スケジューラの表示設定 { dayStart?, dayEnd?, pxPerMin?, slotMinutes?, days? }(v0.5・下記) | | calendar | { holidays: 'jp' } | 営業日カレンダー(下記) | | zoom | 'day' | 'hour' \| 'day' \| 'week' \| 'month' \| 'quarter' \| 'year' | | autoSchedule | true | 依存タイプ4種の連鎖シフト(後続を制約の満たされる位置へ押し出す・循環は拒否) | | criticalPath | false | クリティカルパス(スラック0のタスク/リンク)の強調表示 | | resourceHistogram | false | 下部リソースヒストグラムパネル(日別の割当合計・過負荷を赤)(v0.3) | | histogramMode | 'load' | ヒストグラムの表示モード 'load'(実数[人日])/ 'util'(稼働率[%])(v0.3) | | progressLine | false | 進捗ライン(today 基準のイナズマ線)(v0.3) | | defaultLinkType | 'FS' | ドラッグ作成する依存リンクの既定タイプ | | footer | true | 集計フッター行(列に footer があるとき表示) | | columns | ['wbs','name','start','duration','progress'] | グリッド列(assignees / delay も組み込み・名前 or 列定義) | | gridWidth | 列幅合計 | 左ペインの初期幅(px) | | ganttColumns / ganttOverlays | [] | カスタム列 / オーバーレイの登録 | | readOnly | false | ドラッグ編集を無効化 | | virtualThreshold | 2000 | 可視行がこの数を超えたら仮想スクロール(上下スペーサ+可視スライス描画)に切り替える(v0.4) |

データ形式

  • task: { id, name, start, end | duration, progress?, parent?, milestone?, open?, color?, assignees? }
    • duration は営業日数(カレンダー基準)。end 併用時は end 優先。日付は 'YYYY-MM-DD' / Date / タイムスタンプ
    • 子を持つタスクはサマリー表示(start 省略時は子の包絡期間・進捗は子の営業日重み付き平均で自動集計)
    • assignees(v0.3): ['sato', 'tanaka'](リソースID)または [{ resource: 'sato', units: 0.5 }](units は稼働率・既定 1=100%)
  • link: { id?, from, to, type?: 'FS'|'SS'|'FF'|'SF', lag?: 営業日数 }
    • FS(終了→開始・既定): 後続は先行の終了後に開始 / SS(開始→開始): 後続は先行の開始以降に開始 / FF(終了→終了): 後続は先行の終了以降に終了 / SF(開始→終了): 後続は先行の開始以降に終了。lag は営業日(負数=リード)
  • resource(v0.3): { id, name, color?, capacity? }。capacity は1日あたりの容量(既定 1)。日別割当合計が capacity を超えた日はヒストグラムで過負荷(赤)。スケジューラビューでは縦軸の1行になる
  • event(v0.5・スケジューラ): { id, name, resource, start, end | duration, color? }
    • start/end は日時('YYYY-MM-DD HH:MM' / 'YYYY-MM-DDTHH:MM' / Date / タイムスタンプ)。時刻省略時は 00:00。duration は分(end 省略時に使用・既定60分)
    • resource は割当先リソースID。同一リソースで時間が重なるイベントは段組み(レーン)表示される
  • scheduler(v0.5): { dayStart?: '08:00', dayEnd?: '20:00', pxPerMin?: 1.2, slotMinutes?: 60, days? }。1日の描画は営業時間ウィンドウ [dayStart, dayEnd] ぶんに限定され横幅が有界になる。slotMinutes は時刻目盛りとドラッグのスナップ幅
  • calendar: { workdays?: [1,2,3,4,5], holidays?: 'jp'|false, yearEnd?: true, customHolidays?: ['2026-08-13'], customWorkdays?: ['2026-10-10'], scheduleOnHolidays?: false }
    • scheduleOnHolidays: true で休日にも予定を引ける(スナップ・日数計算が暦日ベースに。土日祝の網掛けは残る)。実行時は gantt.setScheduleOnHolidays(v) / getScheduleOnHolidays() で切替可(切替時は既存タスクの日数を現在モードで数え直し・日付は動かさない)

Gantt メソッド

| メソッド | 説明 | |---|---| | getTask(id) / updateTask(id, fields) | 取得 / 更新(日付は営業日にスナップ・依存の連鎖シフト・undo 可能) | | addTask(task) / removeTask(id) | 追加 / 削除(子孫・関連リンクごと) | | addLink({from, to, type?, lag?}) / removeLink(id) | 依存の追加(循環は警告して拒否)/ 削除 | | updateLink(idOrPair, {type?, lag?}) | 依存タイプ / lag の変更(連鎖シフト・undo 可能) | | indentTask(id) / outdentTask(id) / moveTask(src, ref, place) | インデント / アウトデント / 並べ替え(place: 'before'\|'after'\|'child') | | setCriticalPath(bool) / getCriticalPath() | クリティカルパスの強調表示 | | setAutoSchedule(bool) / setDefaultLinkType(type) | 自動スケジュールの切替 / 新規リンクの既定タイプ | | setResources(list) / getResource(id) | リソース定義の差し替え / 取得(v0.3) | | assignResource(taskId, resource, units?) / unassignResource(taskId, resource) | リソース割当の追加 / 解除(undo 可能・assignChange 発火)(v0.3) | | getHistogram(range?) | 現在の割当からリソースヒストグラム(日別合計・過負荷・ピーク)を計算(純粋関数)(v0.3) | | setResourceHistogram(bool) / setHistogramMode('load'\|'util') | 下部ヒストグラムパネルの表示 / 実数⇔稼働率 切替(v0.3) | | captureBaseline() / clearBaseline() / hasBaseline() / getBaseline(id) | ベースライン(計画)の保存 / 破棄 / 有無 / 取得(v0.3) | | setProgressLine(bool) / getProgressLine() | 進捗ライン(イナズマ線)の表示切替(v0.3) | | importTSV(text, {mode?, parent?}) | Excel/TSV貼り付けをタスクツリーに取り込む(mode: 'replace'(既定)/ 'append'・インデントで階層化)(v0.4) | | exportCSV(opts?) / downloadCSV(filename?, opts?) | 現在のタスクを CSV 文字列に / CSV ファイルをダウンロード(BOM付きUTF-8・DFS順・名前は字下げ)(v0.4) | | exportPNG(opts?) / renderCanvas(opts?) / downloadPNG(filename?, opts?) | タイムラインを PNG(dataURL) に / canvas を返す / PNG をダウンロード(v0.4) | | print() | 印刷ダイアログを開く(印刷CSSで A4横・ページ分割)(v0.4) | | setView('gantt'\|'scheduler') / getView() | ガント⇔スケジューラのビュー切替(v0.5) | | addEvent(event) / updateEvent(id, fields) / removeEvent(id) | スケジューライベントの追加 / 更新(resource/start/end/duration・undo 可能)/ 削除(v0.5) | | getEvent(id) / getEvents() / setEvents(list) | イベントの取得(内部表現)/ 一覧(正規化コピー)/ 一括差し替え(v0.5) | | selectEvent(id) / getSchedulerLayout() | イベント選択 / 現在の段組みレイアウト(リソース別レーン数・配置)を取得(v0.5) | | toJSON() / fromJSON(json) | 正規化 JSON の出力 / 復元(リソース/割当/ベースライン/イベント含む・ラウンドトリップ保証) | | undo() / redo() | コマンドログによる取り消し / やり直し | | zoomTo(zoom) / zoomStep(dir, anchor?) / scrollToTask(id) | ズーム切替(左端の日付を維持)/ 段階ズーム / タスクへスクロール | | on(event, cb) / off(event, cb) / destroy() | イベント / 破棄 |

イベント

taskClick / taskDblClick / taskDrop / progressChange / linkAdd / linkClick / expand / collapse / selectionChange / assignChange / change + スケジューラ(v0.5): eventClick / eventDblClick / eventDrop / eventAdd / viewChange

change はあらゆる変更で発火します(保存フック用)。taskDrop は move / resize / progress ドラッグの確定で、eventDrop はスケジューラでイベントを別リソース/別時間へドラッグ確定したときに発火します({ event, mode })。

カスタム列 — defineGanttColumn(def)

render(task, gantt) は文字列 or DOM Node を返します。footer(gantt) を定義すると集計フッター行にその列の集計値が出ます(組み込み列も件数・日数合計・重み付き進捗などを出します)。

import { defineGanttColumn } from '@sano1023/rs-gantt';

const assignee = defineGanttColumn({
    name: 'assignee', title: '担当', width: 80,
    render: (task, gantt) => task.assignee || '-',
    footer: (gantt) => `${gantt._tasks.length} 行`,   // フッター行に集計を表示
});
createRSGantt('#app', { ganttColumns: [assignee], columns: ['wbs', 'name', 'assignee', 'start'] });

カスタムオーバーレイ — defineGanttOverlay(def)

today線・非稼働日の網掛けも同じ API の組み込みオーバーレイです。

import { defineGanttOverlay } from '@sano1023/rs-gantt';

const deadline = defineGanttOverlay({
    name: 'deadline', layer: 'over',                  // 'under'(バーの下)| 'over'(上)
    render({ scale, el, height }) {
        const line = document.createElement('div');
        line.style.cssText = `position:absolute;top:0;width:2px;height:${height}px;background:#f59e0b`;
        line.style.left = `${scale.x(window.rsGantt.parseDate('2026-10-01'))}px`;
        el.appendChild(line);
    },
});

リソースとトラッキング(v0.3)

const gantt = createRSGantt('#app', {
    tasks: [
        { id: 1, name: '実装', start: '2026-07-06', duration: 8, assignees: ['tanaka'] },
        { id: 2, name: '試験', start: '2026-07-06', duration: 8, assignees: [{ resource: 'tanaka', units: 0.5 }] },
    ],
    resources: [{ id: 'tanaka', name: '田中', color: '#59a14f', capacity: 1 }],
    columns: ['wbs', 'name', 'assignees', 'start', 'duration', 'delay'], // assignees=担当列, delay=遅延日数列
    resourceHistogram: true,    // 下部に日別割当ヒストグラム(capacity 超過日は赤)
    progressLine: true,         // today 基準の進捗ライン(イナズマ線)
});

gantt.assignResource(1, 'tanaka', 0.5);   // 割当(units=稼働率)・unassignResource(id, res) で解除
gantt.setHistogramMode('util');           // 'load'(人日)⇔ 'util'(稼働率%)
const h = gantt.getHistogram();           // { byResource:[{id, days:Map, peak, overloadDays, capacity}], maxLoad }

// ベースライン(計画)を保存 → 以後タスクを動かすとバー下に薄い計画バー・delay 列に営業日で遅延が出る
gantt.captureBaseline();
gantt.updateTask(1, { start: '2026-07-13' });  // 後ろ倒し → delay 列に「+5日」
gantt.clearBaseline();

集計は純粋関数として単体でも使えます(computeHistogram / endDelta / captureBaseline / normalizeResources)。

大規模データと入出力(v0.4)

// 仮想スクロール: 可視行が virtualThreshold(既定 2000)を超えると自動で上下スペーサ+可視スライス描画に切替。
// 左ペイン(ツリーグリッド)と右ペイン(タイムライン)は同じ可視スライスで縦スクロール同期。行高は固定 32px。
const gantt = createRSGantt('#app', { tasks: bigTasks /* 1万件でもOK */ });

// Excel/スプレッドシートからコピーしたタブ区切りを取り込む(名前セル先頭の空白 or 空列でインデント階層化)
gantt.importTSV(`タスク名\t開始\t終了\t担当
設計フェーズ
  基本設計\t2026-07-06\t2026-07-10\t高橋
  DB設計\t2026-07-13\t2026-07-17\t田中、鈴木
    テーブル定義\t2026-07-13\t2026-07-15\t田中`);   // { mode: 'append', parent } で末尾追記も可

// エクスポート
gantt.downloadCSV('工程表.csv');   // BOM付きUTF-8・WBS/名前(字下げ)/開始/終了/日数/進捗/担当
gantt.downloadPNG('工程表.png');   // タイムラインを canvas 描画して PNG 保存(exportPNG() は dataURL)
gantt.print();                     // 印刷ダイアログ(印刷CSSで A4横・ページ分割・操作用装飾は非表示)

TSVパース(parseTSV)・CSV生成(tasksToMatrix + toCSV)・canvas描画(renderToCanvas)は import して単体でも使えます。

スケジューラビュー(v0.5)

view: 'scheduler' で、縦軸=リソース(部屋/設備/人)× 横軸=時間の予約・シフト表になります。イベントをドラッグで別リソース/別時間へ移動でき、右端で終了時刻を変更できます。同一リソースで**時間が重なるイベントは段組み(レーン)**で並びます。

const scheduler = createRSGantt('#app', {
    view: 'scheduler',
    resources: [                                        // 縦軸: 部屋/設備/人
        { id: 'roomL', name: '大会議室', color: '#4e79a7' },
        { id: 'roomM', name: '中会議室', color: '#59a14f' },
        { id: 'car',   name: '社用車',   color: '#e15759' },
    ],
    events: [                                           // 予約/シフト(start/end は日時・重なりは段組み)
        { id: 'b1', resource: 'roomL', name: '全体定例', start: '2026-07-09 09:00', end: '2026-07-09 10:30' },
        { id: 'b2', resource: 'roomL', name: '採用面接', start: '2026-07-09 10:00', end: '2026-07-09 11:00' }, // b1 と重なる→別レーン
        { id: 'b3', resource: 'car',   name: '客先訪問', start: '2026-07-10 09:00', end: '2026-07-10 17:00' },
    ],
    scheduler: { dayStart: '08:00', dayEnd: '20:00', slotMinutes: 60 }, // 営業時間ウィンドウ・時刻目盛り/スナップ幅
});

scheduler.on('eventDrop', (e) => save(e.event));       // 別リソース/別時間へドロップ確定({ event, mode })
scheduler.addEvent({ id: 'x', resource: 'roomM', name: '打合せ', start: '2026-07-13 14:00', end: '2026-07-13 15:00' });
scheduler.updateEvent('b1', { resource: 'roomM', start: '2026-07-09 11:00' }); // undo 可能
scheduler.setView('gantt');                            // ガントビューへ切替(同一インスタンスで相互切替可)

段組みの重なり計算は純粋関数として import して単体でも使えます(packLanes(events) / layoutScheduler(events, resources) / overlaps(a, b))。日時ユーティリティは parseDateTime / formatDateTime / formatTime、座標変換は SchedulerScale。土日・祝日(営業日カレンダー)はスケジューラでも網掛けされます。

祝日・営業日 API(単体でも使える)

import { listHolidays, holidayName, createCalendar, parseDate } from '@sano1023/rs-gantt';
listHolidays(2026);                       // [{ date: '2026-01-01', name: '元日' }, ...]
const cal = createCalendar();             // 土日+祝日+年末年始
cal.isWorkday(parseDate('2026-07-20'));   // false(海の日)
cal.addWorkdays(parseDate('2026-07-16'), 2); // 営業日で2日進める

キーボード操作

↑↓ 行選択 / ←→ 選択タスクを1営業日移動 / Shift+←→ リサイズ / Tab / Shift+Tab インデント / アウトデント / Enter taskDblClick 発火 / Space 折りたたみ / Delete 選択リンク削除(スケジューラでは選択イベント削除)/ Ctrl+Z / Ctrl+Y undo / redo / Ctrl+ホイール ズーム

テーマ

CSSカスタムプロパティ --rsgt-* で差し替え:

.rsgt { --rsgt-bar-bg: #4e79a7; --rsgt-milestone: #b45309; --rsgt-today: #ef4444; --rsgt-nonwork-bg: rgba(100,116,139,.1); }

仕組み

公開API createRSGantt → Gantt 本体(正規化・ツリー構築・undo/redoコマンドログ・JSON入出力)
    ├─ TaskGrid(左: ツリー表 role=treegrid・列プラグイン・列幅ドラッグ)
    ├─ Timeline(右: DOM行+バー・アバター・ベースラインバー・TimeScale・LinkLayer(SVG依存線)・Overlay)
    │    └─ DragController(Pointer Events: move/resize/progress/link・ゴースト+日付ツールチップ)
    ├─ ResourceHistogram(下部: 日別割当ヒストグラム・過負荷赤・稼働率ビュー・横スクロール同期)
    ├─ SchedulerView(v0.5: 縦軸=リソース×横軸=時間の予約表・イベントドラッグ・段組み・SchedulerScale 分シリアル値の座標変換)
    └─ 純粋関数群(Node 単体テスト)
         ├─ Scheduler(トポロジカルソート・循環検出・依存4種の連鎖シフト propagate・クリティカルパス computeCritical)
         ├─ lanes(v0.5: 重なり段組みレイアウト packLanes・リソース別 layoutScheduler)
         ├─ resources(割当の正規化・ヒストグラム集計 computeHistogram・過負荷判定)
         ├─ baseline(計画スナップショット captureBaseline・遅延日数 endDelta)
         └─ Calendar(営業日計算・スナップ)← holidays-jp(祝日ルール計算・年単位メモ化)
  • 日時計算はタイムゾーン安全: 内部は「日シリアル値」(ローカル日付 y/m/d からの通算日の整数)で計算し、Date のミリ秒演算を日付境界に使わない(DST・TZずれの根絶)
  • 祝日は計算式+ルールテーブルのハイブリッド: 固定日・ハッピーマンデー・春分/秋分の天文近似式・振替休日・国民の休日をルールで計算し、法改正・特例(五輪等)は例外テーブルで上書き。データファイル依存なし
  • タイムラインは DOM、依存線のみ SVG 1枚: バー=絶対配置 div は Pointer Events のドラッグ実装と CSS テーマの相性がよく、依存線はクリック選択できる <path>(当たり判定用の太い透明パス併設)
  • ドラッグ 60fps: rAF で間引き、ドラッグ中はゴーストと当該タスクの依存線のみ再計算

ロードマップ(REQUIREMENTS.md 参照)

  • v0.5(完了): スケジューラビュー(view: 'scheduler'・縦軸=リソース×横軸=時間の予約/シフト表)・イベントのドラッグでリソース間移動 / 時間変更 / 終了時刻リサイズ・時間が重なるイベントの段組み(レーン)表示・営業時間ウィンドウ・非稼働日の網掛け
  • v0.4(完了): 仮想スクロール(1万タスクでも可視域だけDOM描画・左右ペイン同期・行高固定32px)・Excel/TSV貼り付けインポート(インデントで階層化)・CSVエクスポート(BOM付き)・PNGエクスポート(canvas描画)・印刷CSS(A4横・ページ分割)
  • v0.3(完了): リソース(担当者)割当(バー/グリッド列にアバター)・リソースヒストグラム(日別割当合計・過負荷を赤・稼働率ビュー)・ベースライン比較(薄い計画バー + 遅延日数列)・進捗ライン(イナズマ線)
  • v0.2(完了): 依存4種(FS/SS/FF/SF)+lag・自動スケジューリング(連鎖シフト・循環拒否)・クリティカルパス・サマリー期間/進捗の自動集計・列カスタムレンダラ + 集計フッター行・行のドラッグ並べ替え / インデント(Tab)・時/四半期/年ズーム + Ctrl+ホイール

検証

  • Node 単体テスト66項目(祝日2026年全件を内閣府データと照合・五輪特例・振替休日・営業日スナップ・循環検出・依存4種の連鎖シフト propagate・クリティカルパス computeCritical のスラック判定・リソース割当の正規化 / ヒストグラム集計 / 過負荷判定・ベースライン遅延の営業日計算・仮想スクロールの可視スライス計算 / スペーサ恒等式・TSVパースのインデント階層化・CSVエスケープ・段組みレイアウト packLanes / layoutScheduler の最小レーン数と再利用・分シリアル値の日時ユーティリティ・SchedulerScale の座標変換)を全パス(node --test test/)
  • ヘッドレスChromium による受け入れテスト:v0.1 の15項目(描画整合・ズーム・全ドラッグ操作・祝日網掛けとスナップ・JSONラウンドトリップ・undo/redo・不正データ耐性・1,000タスク+500リンク初期描画500ms以内)+ v0.2 の11項目(依存4種のシフト・連鎖・循環拒否・クリティカルパス強調・サマリー自動集計・Tab/Shift+Tab インデント・行ドラッグ並べ替え・時/四半期/年ズーム・Ctrl+ホイール・集計フッター)+ v0.3 の6項目(リソースをバー/列に表示・ヒストグラムの日別合計が割当と一致し過負荷が赤・ベースライン保存後の遅延日数と薄い計画バー・進捗ラインの左折れ・JSONラウンドトリップ)+ v0.4 の8項目(1万タスクで可視域だけDOM描画・初期描画700ms以内・左右ペインのスクロール同期・TSVインポートの階層化・CSV内容とBOM・PNGのバー画素・印刷CSS)+ **v0.5 の7項目(縦軸=リソース×横軸=時間の予約表描画・イベントをドラッグで別リソース/別時間へ移動しモデル更新・時間が重なるイベントの段組み・営業日カレンダーとの整合・イベントのJSONラウンドトリップとundo/redo)**を全パス(コンソールエラー0件)

ライセンス

MIT © ryusuke.sano