pm-gantt-chart
Gantt chart renderer and multi-format exporter for pm-cli.
Renders your pm items as a week-by-week timeline in the terminal — grouped by milestone, sprint, release, assignee, status, type, or tag — and exports the same chart to Mermaid gantt, standalone HTML, ASCII, or a CSV schedule. Can compute and highlight the critical path (longest dependency chain), and run dependency-aware scheduling that derives each item's start/end from its blocked-by chain plus estimates.
Example output
pm gantt • 8 weeks from 2026-06-01 • critical path marked
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
GROUP ITEM S W1 W2 W3 W4 W5 W6 W7 W8
──────────────────────────────────────────────────────────────────────────────────────────
Jun 1 Jun 8 Jun 15 Jun 22 Jun 29 Jul 6 Jul 13 Jul 20
──────────────────────────────────────────────────────────────────────────────────────────
S1 *Build endpoint ▶ ▓▓ ▓▓
*Design API ✓ ▓▓
S2 *Release ○ ▓▓ ▓▓ ▓▓ ▓▓
Write docs ○ ░░ ░░ ░░
*Integration tests ○ ▓▓ ▓▓ ▓▓
(no milestone) Backlog grooming ○ ░░ ░░
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Legend: ██ in_progress/blocked ░░ open/planned ▓▓ critical-path (*) ·· undated S: ▶in_progress !blocked ✓closed ○openInstallation
pm install unbraind/pm-gantt-chartOr from a local clone:
pm install ./path/to/pm-gantt-chartUsage
Terminal chart — pm gantt
# Default: 8 weeks, grouped by milestone, all statuses
pm gantt
# Show 12 weeks
pm gantt --weeks 12
# Group by sprint / release / assignee / status / type
pm gantt --group-by sprint
pm gantt --group-by release
pm gantt --group-by assignee
pm gantt --group-by status
# Show only in-progress items
pm gantt --status in_progress
# Anchor the window at a specific date, or clip it with --to
pm gantt --from 2026-06-01 --weeks 16
pm gantt --from 2026-06-01 --to 2026-08-01
# Dependency-aware scheduling: derive start/end from blocked-by chains + estimates
pm gantt --schedule
pm gantt --schedule --default-duration 3
# Compute & mark the longest dependency chain
pm gantt --critical-path
# Show only the critical path (great paired with --schedule)
pm gantt --critical-only --schedule
# Show each item's % complete on its bar
pm gantt --progress
# Overlay fixed release/deadline dates as labeled vertical markers
pm gantt --milestones "v1.0=2026-06-30,v1.1=2026-08-15"Export — pm gantt export
# Mermaid `gantt` diagram (default format) to stdout
pm gantt export
# Mermaid to a file
pm gantt export --format mermaid --output roadmap.mmd
# Standalone, self-contained HTML
pm gantt export --format html --output roadmap.html
# Plain ASCII (the same chart `pm gantt` prints)
pm gantt export --format ascii --output roadmap.txt
# CSV schedule: id,title,start,end,duration_days,slack_days,deps,status,critical,progress_percent,overdue,off_window
pm gantt export --format csv --schedule --output schedule.csv
# Export honors the same shaping flags (including --schedule / --critical-only)
pm gantt export --format html --group-by assignee --critical-path --weeks 12 --output team.html
pm gantt export --format mermaid --schedule --group-by sprint --output plan.mmdThe exporter writes to the file given by --output, or prints to stdout when omitted (handy for piping into a Mermaid live editor).
Options
Both pm gantt and pm gantt export accept the shaping flags:
| Flag | Values | Default | Description |
|------|--------|---------|-------------|
| --weeks <n> | 1–52 | 8 | Number of weeks to display (ignored when --to is set) |
| --group-by <field> | milestone | sprint | release | type | assignee | status | tag | milestone | How to group items into rows |
| --status <filter> | open | in_progress | blocked | closed | canceled | draft | all | all | Filter items by status |
| --from <iso> | YYYY-MM-DD | current week | Anchor the chart window at this date |
| --to <iso> | YYYY-MM-DD | — | Clip the window to end at this date (derives the week count, overriding --weeks) |
| --schedule | flag | off | Dependency-aware scheduling: derive start/end from blocked-by chains + estimates |
| --default-duration <days> | integer ≥ 1 | 5 | Fallback duration for items with no estimate under --schedule |
| --critical-path | flag | off | Compute & mark the longest dependency chain |
| --critical-only | flag | off | Show only items on the critical path (implies critical-path computation) |
| --progress | flag | off | Show each item's % complete on its bar |
| --milestones <list> | name=YYYY-MM-DD,… | — | Draw fixed release/deadline dates as labeled vertical markers on the timeline |
pm gantt export adds:
| Flag | Values | Default | Description |
|------|--------|---------|-------------|
| --format <fmt> | mermaid | html | ascii | csv | mermaid | Output format |
| --output <file> | path | stdout | File to write (prints to stdout if omitted) |
csv emits a schedule table: id,title,start,end,duration_days,slack_days,deps,status,critical,progress_percent,overdue,off_window (deps = space-separated blocking ids). Pair it with --schedule for dependency-derived dates and slack. slack_days is the total float in days (only populated under --schedule; blank otherwise): 0 marks a critical-path item, a positive value is how many days the task can slip without delaying the project, and a negative value means the plan is already late for a downstream deadline. The trailing risk columns make the CSV useful directly in spreadsheets and portfolio reports: critical/overdue are yes/no, progress_percent is 0..100, and off_window distinguishes before, after, and undated rows.
Slack / float, critical path & infeasible deadlines
Under --schedule, a backward pass (classic CPM) computes each item's latest feasible start/finish from the project end and any downstream deadlines, then derives total slack = latest start − earliest start:
- 0 slack → the item is on the critical path; any slip delays the project.
- positive slack → the item can slip that many days harmlessly.
- negative slack → the item's required start (to hit a downstream deadline) is before its earliest feasible start. The plan is already late. These items are listed in a
WARNING:block on stderr by bothpm ganttandpm gantt export, and flagged per-task in the JSON result (tasks[].slack_days,tasks[].infeasible, plusinfeasibleCount/warnings).
Preflight data-sanity gate
Before rendering, both pm gantt and pm gantt export run a preflight data-sanity gate so bad data surfaces early instead of producing a silently-confusing chart. It splits problems into two tiers:
Hard-fail (blocks, non-zero exit) — a dependency cycle. A cycle has no valid topological order, so dependency-aware scheduling is impossible and any chart drawn from it would be plausible-looking but wrong. The command aborts with a clear error naming the full cycle path, e.g.:
gantt: 1 fatal data problem(s) make scheduling impossible: • dependency cycle: pm-a "Design" → pm-b "Build" → pm-a "Design" Resolve the dependency cycle(s) above and re-run.Warn (non-blocking, stderr; chart still renders, exit 0) — soft issues that still yield a useful chart: a deadline that precedes the item's own start date, and an implausibly large estimate (over ~2000h, almost always a minutes-vs-hours unit error). These print a
NOTE:block on stderr and are suppressed under--jsonto keep machine-readable output clean.
Fully valid data produces no warnings and no block. (Infeasible/unreachable downstream deadlines are a separate, lighter signal — they are flagged in the schedule's backward pass rather than by this gate; see above.)
TODAY marker (all formats)
The current week is indicated in every format, shown only when "today" falls inside the chart window:
- ASCII — a
▼TODAYcaret under the week column that contains the current date. - Mermaid — a
%% today: <date>comment. - HTML — the matching week column is highlighted with a red vertical rule and a
▼ todaylabel in the header.
--milestones — fixed release/deadline dates
Items are scheduled work; milestones are immovable calendar targets (a release, a launch, a contractual deadline). In cross-functional views that aren't grouped by milestone, those dates are otherwise invisible. --milestones overlays them as labeled vertical markers so deadline pressure is obvious at a glance.
Pass a comma-separated list of name=YYYY-MM-DD entries:
pm gantt --milestones "v1.0=2026-06-30,v1.1=2026-08-15"- ASCII — a
▼<name>caret in the week column the milestone lands in (parity with the▼TODAYmarker). Multiple milestones in the same week are comma-joined (▼v1.0,beta). - Mermaid — a dedicated
section Milestoneswith native zero-duration:milestonemarkers on the exact date, so they render as the diamond marker. - CSV — appended rows (
id=milestone:<name>,status=milestone,start=end=date) so the dates round-trip alongside the schedule.
Milestones outside the rendered window are ignored on the chart/Mermaid output, with a one-line note on stderr (CSV still includes them so the data round-trips). Malformed entries (missing =, empty name, or a non-ISO date) fail cleanly with a usage error rather than crashing. The same flag is honored by pm gantt export.
--progress — % complete on bars
--progress (opt-in) renders each item's completion ratio on its bar. The ratio is derived deterministically from available pm signals:
- closed / canceled → 100%
- an explicit
meta.progress/meta.percent_completenumber (a0..1fraction or a0..100percent) → honored verbatim - an acceptance-criteria checklist in the body (
- [x]vs- [ ]) → checked / total - in_progress with no other signal → 50% (a "halfway" default); blocked → 25%
- everything else (open / draft) → 0%
It surfaces as a trailing NN% plus a coarse fill glyph in ASCII (·· 0% · ░░ 25% · ▓░ 50% · ▓▓ 75% · ██ 100%), as a %% tN progress: comment in Mermaid (the diagram has no native per-task percent field), as a width-sized fill overlay plus a NN% label in HTML, and as progress_percent in CSV.
Overdue / deadline-risk highlighting
Items whose deadline is before today and that are not closed/canceled are flagged automatically (no flag needed):
- ASCII — a trailing
‼ OVERDUEmarker on the row. - Mermaid — the task carries the
crittag (the diagram's deadline-risk styling) plus an%% overdue:comment. - HTML — the bar gets a red striped fill, the due date turns red, and the row label shows a
‼ overduemarker.
Overdue items are also counted in the JSON result (overdueCount, overdue[]) and listed in a NOTE: block on stderr (suppressed under --json).
Off-window vs. undated items
A genuinely undated item (no dates at all) and an item whose dates fall entirely outside the chart window used to look identical (both ··). They are now distinguished:
- undated →
··(ASCII) / a hatched cell (HTML). - off-window earlier →
←·(ASCII) / a←hint in the first column (HTML). - off-window later →
·→(ASCII) / a→hint in the last column (HTML).
The JSON result reports offWindowCount and undatedCount. Mermaid is unaffected (it always renders real dates).
ASCII TODAY marker
The terminal chart draws a ▼TODAY caret under the week column that contains the current date (parity with the Mermaid %% today: marker and the HTML today column), shown only when "today" falls inside the chart window.
HTML summary & assignee workload
The HTML export ends with a Summary footer — project span (start → end and day count), critical-path length, and total task-days. When exported with --group-by assignee, an additional Assignee workload table lists each assignee's total task-days (descending).
How it works
- Columns — each column is one calendar week, starting from the Monday of the anchor week (
--from, or the current week by default).--toclips the window and derives the week count. - Rows — items are grouped by the chosen field; items with no value land in a
(no milestone)/(no sprint)/(no release)/(no type)/(unassigned)/(no tag)group.--group-by statusgroups by lifecycle status. - Bars (default) — a bar spans from the item's
created_atto itsdeadline. If only a deadline is known, a one-week bar ending on it is shown. Items with no dates at all are shown as··(undated). - Bars (
--schedule) — a forward pass schedules each item to start the day after the latest item it isblocked_byfinishes. Duration comes fromestimated_minutes(8h workday, rounded up to whole days) or--default-duration. Items with a reachabledeadlineare back-anchored to end on it. The chain ordering, not the calendar, drives the bars — a late chain can push a dependent past its deadline, which is exactly what a schedule should expose. - Critical path — with
--critical-path(or--critical-only), the longest chain ofdependenciesedges is computed (cycle-safe), its items prefixed with*and drawn with▓▓bars. Ties break toward the chain with the latest final deadline.--critical-onlydrops every off-path item. - Symbols —
██= in_progress/blocked,░░= open/planned,▓▓= critical path,··= undated,←·/·→= off-window (dates earlier / later than the window),‼ OVERDUE= past deadline & not closed.
Item fields used
Items are read via pm list-all --json --include-body.
| Field | Used for |
|-------|----------|
| title | Row label |
| status | Bar style and status symbol; also used with --status filter |
| deadline (or legacy due_date) | Right edge of the bar; back-anchor target under --schedule |
| created_at | Left edge of the bar (default mode) |
| estimated_minutes | Task duration under --schedule (8h workday) |
| sprint / release / milestone | Group key for --group-by milestone (default), sprint, release |
| type | Group key for --group-by type |
| assignee | Group key for --group-by assignee |
| status | Group key for --group-by status; also bar style |
| tags[0] | Group key for --group-by tag |
| dependencies[].id (kind blocked_by) | Edges used for scheduling and the critical path |
Development
npm install # install dev dependencies
npm run build # build TypeScript → dist/
npm test # build + run smoke tests
npm run check # tsc --noEmit
pm install . # load the built extension locallyRequirements
- pm-cli
>=2026.5.29 - Node.js
>=20
License
MIT
Release Automation
This package is release-ready for GitHub, npm, and Bun-compatible installs. CI runs type checking, build, production dependency audit, package packing, Bun install verification, and pm-changelog validation. The daily release workflow publishes only when commits exist after the latest release tag and uses pm-changelog to generate CHANGELOG.md and GitHub release notes.